On January 23, 2019, the Master Architects for the Community Civic Campus provided an update on the planning and design for the Measure W project to the South San Francisco community and City Council. The architects presented the Library and Parks & Recreation and the Community Theater / City Council Chambers buildings. The team shared a building footprint and size, internal plan development and significant room and space adjacencies. Also discussed was dedicated open space and transportation and parking at the site. City Council agreed to advance the police facility project so it could start construction as soon as possible.  The new Fire Station, to be built at a later date, was also reviewed.

High resolution image.

Architectural site plan of Library and Parks & Rec Facility

The Civic Campus Center site is comprised of two projects. Phase One is the new Police Operations & 911 Dispatch Center and Phase Two is the new Library, Parks & Recreation and Community Theater / Council Chamber. Phase One is located at the site of the former Pet Club at the corner of Chestnut Avenue and Antoinette Lane. Phase Two is located at the vacant lot enclosed by El Camino Real, Chestnut Avenue, and Antoinette Lane.  

Architectural floor plan overview of Library and Parks & Rec Facility

The new Library and Parks & Recreation Building is three stories tall. The exterior architectural aesthetic of this facility is still in very early development, but it will ultimately be a dynamic and vital civic presence for South San Francisco.     

Architectural floor plan of Library and Parks & Rec at level 1

Level 1 is the lowest level and opens to the expansive open park area to the north. This park side “Events and Gathering” level is accessed through a generous lobby and is the area to host large gatherings and big events. Near the center of the building is a drop-off location for book returns, an information desk, a central stair, and elevators.

Architectural floor plan of Library and Parks & Rec at level 2

Level 2 was organized to house the most active and vibrant spaces that include activities such as children’s spaces and dance classes. This floor, referred to as the “Activity Hub,” is organized around a wide and generous central corridor that functions as a “Main Street” where patrons can wait, meet family and friends, or hang out. Main Street will also feature an art gallery and temporary exhibits.

Architectural floor plan of Library and Parks & Rec at level 3

Level 3 is the top floor. It is primarily dedicated to library functions and will feature a bookstore/market place atmosphere. At the center of this floor is a large open area that functions as a lounge for reading, meeting up with friends, or pre-function space for events.

Architectural site plan of exterior space for Library and Parks & Rec Facility

To the north of the new Library and Parks & Recreation Building is recreational open space and surface parking.

Architectural site plan of new Police Station

The new Police Facility is located within the Community Civic Campus to the north of the Library and Parks & Recreation Building, and across Antoinette Lane. 

Architectural floor plans of Level 1 and 2 for new Police Station

Level 1 of the main building will include spaces for patrol, records, criminal investigations, evidence processing and storage, building support, recreation administration, and a public lobby with an adjacent community room and public restrooms.

Architectural site plan of new fire station

Although not within the Community Campus Center site, the new Fire Station, located at the corner of Arroyo Drive and Camaritas Avenue, is an essential component of the project. This third phase of Civic Campus project has been designed but will not be constructed. Timing of construction is still to be determined. Project is yet to be fully funded.  

Architectural floor plan of new fire station.

The one-story station will include three extended apparatus bays, bay support spaces, station alerting, training areas, sleeping rooms, restrooms, dining, and living areas. This Phase Three of the Civic Campus project has been designed but will not be constructed. Timing of construction is still to be determined. Project is yet to be fully funded.