Framing underside of TerraceTerrace
Preparing to install wall panels at Squad BriefingBriefing Room
PD Main Building Facing WestPD Main Building
Installing Resinous Flooring in Work AreaFloor Installation
Install cladding on canopy at Main EntryMain Building Entry
Polishing floors in Break AreaBreak Area
Plastering wallsMen's Locker
Setup Targetry System at Firing RangeSupport Building
Evidence Drop in Main BuildingEvidence Drop
Installing Dispatch furnitureDispatch
Installing temporary fencingFencing
Installing high density shelving at General Property StorageShelving