Steel Decking at Level 2 El Camino Real EntranceSteel Structure
Steel Decking at Level 2 El Camino Real EntranceConcrete Pour
Below Grade Waterproofing at LPR Level 1Below Grade Waterproofing
Concrete Pour at LPR El Camino Real EntranceConcrete Pour
Rebar Installationa and MEP rough in at Level 2 Side ARebar Installation
Rebar Installation at Level 1 Gridline 5-13Rebar Installation
Rebar Installation at Level 2 Side ARebar Installation
Below Grade Waterproofing at Council ChamberWaterproofing Membrane
Concrete Pour at LPR Level 2 Side AConcrete Pour
Rebar Installation at LPR Council ChamberRebar Installation
MEP Installation within Concrete at Slab on GradeMEP Within Slab
LPR Level 2 post concrete pourLPR Level 2