Chipped Piles along Shoring Wall at LPR SiteChipped Production Piles
Excavation of Piles and Elevator Pit for Building FoundationElevator Pit
Joint Trench Work in Antoinette LaneJoint Trench
Below Grade Waterproofing PreparationBelow Grade Waterproofing
Below Grade Waterproofing Installed Along Shoring WallBelow Grade Waterproofing
Excavation of Piles for Building FoundationExcavation
Rebar Installation along Shoring WallRebar Installation
Double Cased Auger Cast PilesAuger Cast Piles
Installing EPS foam in FoundationEPS Foam Installation
LPR Site Gridline 1-5LPR Site
Rebar Installation at LPR SiteRebar Installation
1st Concrete Pour for LPR Building FoundationConcrete Pour